ISS Daily Summary Report – 05/04/15 – NASA https://www.nasa.gov/blogs/stationreport/2015/05/04/iss-daily-summary-report-05-04-15/
Robotics Refueling Mission (RRM) Operations: Over the weekend, the Special Purpose Dexterous Manipulator (SPDM) picked up Task Board 2 (TB2) and the Safety Cap Tool (SCT) from the RRM. The Mobile Transport (MT) was translated to Work Site (WS) 7 where the SPDM stowed TB2 and the Safety Cap Tool on the RRM On-orbit Transfer Cage …
valve R&R MRM1 Interior Imagery and photos downlink via OCA / r/g 8682 “CHIBIS-M’