Dein Suchergebnis zum Thema: m������������������gen

ISS Daily Summary Report – 05/01/14 – NASA

https://www.nasa.gov/blogs/stationreport/2014/05/01/iss-daily-summary-report-05-01-14/

Cell Mechanosensing (CMS)-1 Fixation: Commander (CDR) Wakata removed four Experiment Measurement Units from the Cell Biology Experiment Facility (CBEF) Incubator Unit (IU) 1G and four units from the microgravity CBEF IU. He used RNAlater and Measurement Experiment Solution Exchanger to fix the samples for return on SpX-3. CMS-1 identifies gravity sensors in skeletal muscle cells …
Dragon CWCI pack [Complete] Crew departure prep Data prep return NOD1OS2 LHA R&R M

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 11/17/15 – NASA

https://www.nasa.gov/blogs/stationreport/2015/11/17/iss-daily-summary-report-11-17-15/

Cell Mechanosensing-3:  Yui set up the Multipurpose Small Payload Rack (MSPR) Experiment Laptop Terminal (ELT) in preparation for Cell Mechanosensing-3 operations that will be performed after the arrival of investigation samples on the SpaceX-8 in January, 2016.  He exchanged the laptop hard drive and installed cables between the MSPR Small Experiment Area and the laptop.  …
Ophthalmoscope) Preparation of Reports for Roscosmos Web Site and Social ECON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 12/30/2021 – NASA

https://www.nasa.gov/blogs/stationreport/2021/12/30/iss-daily-summary-report-12-30-2021/

Payloads: 4BCO2 (Four Bed CO2) Scrubber: A crewmember performed sampling of CO2 effluent from the Four Bed CO2 Scrubber. 4BCO2Scrubber demonstrates a technology for removing carbon dioxide (CO2) from the atmosphere on a spacecraft. The technology is based on the current system in use on the ISS with mechanical upgrades in absorption beds, heater elements, …
T2AR OBT, inspect and questionnaire (NASA) Systems: Structures and Mechanisms (S&M)

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 04/29/15 – NASA

https://www.nasa.gov/blogs/stationreport/2015/04/29/iss-daily-summary-report-04-29-15/

59 Progress (59P) Status:  Last night Russian ground controllers resumed 59P troubleshooting during Russian ground passes and were able to establish communications with the vehicle and review telemetry.  Russian controllers configured the refueling system to feed the thrusters and made two unsuccessful attempts to command the thrusters to stabilize the vehicle’s angular rotation. Per Mission …
Per Mission Control Center Moscow (MCC-M) request, the crew will take photos of 59P

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 4/26/2017 – NASA

https://www.nasa.gov/blogs/stationreport/2017/04/26/iss-daily-summary-report-4-26-2017/

NanoRacks External Platform (NREP) Operations:  The crew depressurized and vented the Japanese Experiment Module(JEM) Airlock (JEMAL) in preparation for the JEM Remote Manipulator System (JEMRMS) transfer of the NREP to the JEM External Facility (JEM-EF) this Friday.   Fluid Shifts Baseline Imaging: The 49S crew continued this week’s Fluid Shifts baseline imagery activities.  With one crew …
Observation and photography EKON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 6/20/2017 – NASA

https://www.nasa.gov/blogs/stationreport/2017/06/20/iss-daily-summary-report-6-20-2017/

Bigelow Expandable Activity Module (BEAM):  The crew ingressed BEAM and replaced a 3.3 mm thick Radiation Environment Monitor (REM) shield that was installed onto a REM sensor on May 31, 2017 with a 10.0 mm thick shield that was also printed on the 3D printer onboard the ISS.  BEAM is an experimental expandable module attached …
Observation and Photography ECON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 3/23/2020 – NASA

https://www.nasa.gov/blogs/stationreport/2020/03/23/iss-daily-summary-report-3-23-2020/

JAXA MHU-5 (JAXA Mouse Habitat Unit-5): The crew performed routine mouse habitat maintenance activities for the continuing Mouse Mission-5 investigation. JAXA Mouse Habitat Unit-5 (MHU-5) examines the effects of partial G on mice using the JAXA-developed mouse habitat cage units (HCU) that can be installed in the newly developed Centrifuge-equipped Biological Experiment Facility-L (CBEF-L) on …
Data Preparation for Return – 59 Soyuz Flight Engineer 1 ECON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 5/04/2017 – NASA

https://www.nasa.gov/blogs/stationreport/2017/05/04/iss-daily-summary-report-5-04-2017/

OsteoOmics: The crew thawed BioCells and injected them into growth media inside the Microgravity Science Glovebox (MSG). After six BioCells were processed they were placed into BioCell Habitat 3, which was then placed in the Space Automated Bioproduct Lab (SABL).  Later in the day the crew removed a media kit from a Microgravity Experiment Research …
IMS Delta file prep Memory cards audit EKON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 12/21/2020 – NASA

https://www.nasa.gov/blogs/stationreport/2020/12/21/iss-daily-summary-report-12-21-2020/

Payloads Airborne Particulate Monitor (APM):  The APM hardware was relocated from the US Lab to Node 3.  This hardware is routinely moved to different locations to allow monitoring of the particulate environment in those areas.  Although requirements exist for maximum allowable concentrations of particulate matter, currently no measurement capability verifies whether these requirements are met. …
Vascular Echo NORS N2 transfer Dragon cargo ops Genes in Space N3 Endcone replace M

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 2/20/2024 – NASA

https://www.nasa.gov/blogs/stationreport/2024/02/20/iss-daily-summary-report-2-20-2024/

87 Progress (87P) Docking: Following the completion of a 34-orbit rendezvous, 87P successfully docked to the SM aft port on Saturday, February 17th, at 6:06 AM CST. On Sunday, the crew then performed leak checks, opened hatches, and began unloading cargo. Carrying food, fuel, and supplies, 87P launched from the Baikonur Cosmodrome on Wednesday, February …
Aging Glucose Reading VR Mental Care Session Systems: Russian EDV Inspection S&M

    Kategorien:
  • International
Seite melden