Dein Suchergebnis zum Thema: m������������������gen

ISS Daily Summary Report – 5/16/2017 – NASA

https://www.nasa.gov/blogs/stationreport/2017/05/16/iss-daily-summary-report-5-16-2017/

NanoRack Cubesat Deployer (NRCSD) #11 Deploy:  Six cubesats were deployed today from the ISS: SGSat, CXBN-2 and IceCube, SOMP2, HAVELSAT, and COLUMBIA. SGSat demonstrates the attitude determination and control system reliant on utilization of pictures of star fields to orient the satellite and validate new software used to predict the satellite’s path as it experiences …
Observation and photography ECON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 12/26/2019 – NASA

https://www.nasa.gov/blogs/stationreport/2019/12/26/iss-daily-summary-report-12-26-2019/

Advanced Nanostep: The crew inserted the Advanced Nano Step Return Bag into MERLIN.  Advanced Nano Step, more formally known as Effects of Impurities on Perfection of Protein Crystals, Partition Functions, and Growth Mechanisms, monitors and records how the incorporation of specific impurity molecules affect the development and quality of protein crystals. The crystals grown on …
Monitoring of fires in the south of Australia ECON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 03/06/14 – NASA

https://www.nasa.gov/blogs/stationreport/2014/03/06/iss-daily-summary-report-03-06-14/

Water Recovery System (WRS) Catalytic Reactor Remove & Replace (R&R): On February 24th,  the Water Processor Assembly (WPA) had a fault due to a leak into the catalytic reactor (approximately 1 liter of water). Today, Flight Engineer (FE)-3 Hopkins and FE-5 Mastracchio successfully R&Rd the catalytic reactor.  In preparation for the R&R, Hopkins removed Treadmill …
SM Panel Photo WHC KTO replace Preparation of reports for Roskosmos site EKON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 07/11/16 – NASA

https://www.nasa.gov/blogs/stationreport/2016/07/11/iss-daily-summary-report-07-11-16/

47 Soyuz (47S) Docking: 47S successfully docked to the ISS at 11:06 PM CDT last Friday. The arrival of Expedition 48 crew members Anatoly Ivanishin, Takuya Onishi and Kate Rubins, the ISS will be in 6-crew operations until 46S return on September 6. Dose Distribution Inside the ISS – 3D (DOSIS 3D): Over the weekend, …
Antivirus scan on Auxiliary Computer Laptops / r/g 8247 Completed Task List Items M-Bag

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 4/25/2017 – NASA

https://www.nasa.gov/blogs/stationreport/2017/04/25/iss-daily-summary-report-4-25-2017/

NanoRacks External Platform (NREP) Operations: The crew pressurized the Japanese Experiment Module Airlock (JEMAL), performed a leak check and extended the JEMAL Slide Table (ST) into the JEM Pressurized Module (JPM).  They then removed the Gumstix/Solar Cell payload and attached the NanoRacks-CID and Honeywell-Morehead-DM payloads to the NREP. The ST was then retracted with attached …
Observation and photography EKON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 8/24/2017 – NASA

https://www.nasa.gov/blogs/stationreport/2017/08/24/iss-daily-summary-report-8-24-2017/

Miniature Exercise Device (MED-2):  The crew set up cameras in Node 3 and Cupola to capture video from multiple views of the Advanced Resistive Exercise Device (ARED) and MED-2 hardware, applied body markers, performed exercises and transferred video for downlink.  The microgravity environment of space weakens muscle and bone, so orbiting crew members spend significant …
Reports for Roscosmos web site and social media Recording Greetings Video ECON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 1/09/2020 – NASA

https://www.nasa.gov/blogs/stationreport/2020/01/09/iss-daily-summary-report-1-09-2020/

CBEF-L (Cell Biology Experiment Facility-L): The crew removed the Plant Experiment Unit from the CBEF-L facility and reconfigured the Video output cables for multiple channel ops. CBEF-L is a Japan Aerospace Exploration Agency (JAXA) new subrack facility, which is an upgraded facility of the original Cell Biology Experiment Facility (CBEF) currently aboard the International Space …
Troubleshooting Preparation of reports for Roscosmos website and social media ECON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 7/10/2018 – NASA

https://www.nasa.gov/blogs/stationreport/2018/07/10/iss-daily-summary-report-7-10-2018/

70P Docking: Last night, 70P docked to the DC1 nadir port at 191/01:30:47 GMT and Progress hooks were closed at approximately 01:35:35 GMT. Following the successful docking, the Russian crew completed leak checks, opened the hatches, deactivated the 70P vehicle, and transferred time sensitive cargo.   Cygnus OA-9 Reboost Developmental Test Objective (DTO): Today ground controllers …
, with a Time of Ignition (TIG) of 3:24:50 PM CT, changed ISS velocity by ~0.05 m/

    Kategorien:
  • International
Seite melden