Dein Suchergebnis zum Thema: m������������������������������������������������������gen

ISS Daily Summary Report – 01/14/14 – NASA

https://www.nasa.gov/blogs/stationreport/2014/01/14/iss-daily-summary-report-01-14-14/

Japanese Experiment Module (JEM) Low Temperature Loop (LTL) Pump Status:  Today, the Remote Power Controller (RPC) associated with the JEM LTL Pump tripped open as a result of a spike in current coming from the pump.  The failure caused a short-term loss of cooling for a subset of JEM Systems.  The Flight Control Team has …
Observation and photography EKON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 5/16/2017 – NASA

https://www.nasa.gov/blogs/stationreport/2017/05/16/iss-daily-summary-report-5-16-2017/

NanoRack Cubesat Deployer (NRCSD) #11 Deploy:  Six cubesats were deployed today from the ISS: SGSat, CXBN-2 and IceCube, SOMP2, HAVELSAT, and COLUMBIA. SGSat demonstrates the attitude determination and control system reliant on utilization of pictures of star fields to orient the satellite and validate new software used to predict the satellite’s path as it experiences …
Observation and photography ECON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 12/30/2021 – NASA

https://www.nasa.gov/blogs/stationreport/2021/12/30/iss-daily-summary-report-12-30-2021/

Payloads: 4BCO2 (Four Bed CO2) Scrubber: A crewmember performed sampling of CO2 effluent from the Four Bed CO2 Scrubber. 4BCO2Scrubber demonstrates a technology for removing carbon dioxide (CO2) from the atmosphere on a spacecraft. The technology is based on the current system in use on the ISS with mechanical upgrades in absorption beds, heater elements, …
T2AR OBT, inspect and questionnaire (NASA) Systems: Structures and Mechanisms (S&M)

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 04/29/15 – NASA

https://www.nasa.gov/blogs/stationreport/2015/04/29/iss-daily-summary-report-04-29-15/

59 Progress (59P) Status:  Last night Russian ground controllers resumed 59P troubleshooting during Russian ground passes and were able to establish communications with the vehicle and review telemetry.  Russian controllers configured the refueling system to feed the thrusters and made two unsuccessful attempts to command the thrusters to stabilize the vehicle’s angular rotation. Per Mission …
Per Mission Control Center Moscow (MCC-M) request, the crew will take photos of 59P

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 11/17/15 – NASA

https://www.nasa.gov/blogs/stationreport/2015/11/17/iss-daily-summary-report-11-17-15/

Cell Mechanosensing-3:  Yui set up the Multipurpose Small Payload Rack (MSPR) Experiment Laptop Terminal (ELT) in preparation for Cell Mechanosensing-3 operations that will be performed after the arrival of investigation samples on the SpaceX-8 in January, 2016.  He exchanged the laptop hard drive and installed cables between the MSPR Small Experiment Area and the laptop.  …
Ophthalmoscope) Preparation of Reports for Roscosmos Web Site and Social ECON-M.

    Kategorien:
  • International
Seite melden