Dein Suchergebnis zum Thema: m������������������������������������������������������gen

ISS Daily Summary Report – 3/23/2020 – NASA

https://www.nasa.gov/blogs/stationreport/2020/03/23/iss-daily-summary-report-3-23-2020/

JAXA MHU-5 (JAXA Mouse Habitat Unit-5): The crew performed routine mouse habitat maintenance activities for the continuing Mouse Mission-5 investigation. JAXA Mouse Habitat Unit-5 (MHU-5) examines the effects of partial G on mice using the JAXA-developed mouse habitat cage units (HCU) that can be installed in the newly developed Centrifuge-equipped Biological Experiment Facility-L (CBEF-L) on …
Data Preparation for Return – 59 Soyuz Flight Engineer 1 ECON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 6/20/2017 – NASA

https://www.nasa.gov/blogs/stationreport/2017/06/20/iss-daily-summary-report-6-20-2017/

Bigelow Expandable Activity Module (BEAM):  The crew ingressed BEAM and replaced a 3.3 mm thick Radiation Environment Monitor (REM) shield that was installed onto a REM sensor on May 31, 2017 with a 10.0 mm thick shield that was also printed on the 3D printer onboard the ISS.  BEAM is an experimental expandable module attached …
Observation and Photography ECON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 5/04/2017 – NASA

https://www.nasa.gov/blogs/stationreport/2017/05/04/iss-daily-summary-report-5-04-2017/

OsteoOmics: The crew thawed BioCells and injected them into growth media inside the Microgravity Science Glovebox (MSG). After six BioCells were processed they were placed into BioCell Habitat 3, which was then placed in the Space Automated Bioproduct Lab (SABL).  Later in the day the crew removed a media kit from a Microgravity Experiment Research …
IMS Delta file prep Memory cards audit EKON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 4/28/2017 – NASA

https://www.nasa.gov/blogs/stationreport/2017/04/28/iss-daily-summary-report-4-28-2017/

NanoRacks External Platform (NREP) Installation:  The JEM (Japanese Experiment Module) Remote Manipulator System (JEMRMS) transferred and installed the NREP to the JEM External Facility (JEM-EF).  The Slide Table was returned to the JEM Airlock (JEMAL) and the crew pressurized and vented the Airlock in preparation for future JEMAL activities.  NREP represents the first external commercial …
Soyuz 733 Automatic Phased Array Antenna (АФАР-M ) Power Bus Off/On Saving data

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 4/17/2019 – NASA

https://www.nasa.gov/blogs/stationreport/2019/04/17/iss-daily-summary-report-4-17-2019/

Northrop Grumman 11 (NG-11) Launch/Berth:  NG-11 launched successfully today at 3:46 PM CT from NASA’s Wallops Flight Facility in Virginia.  Over the next two days, S.S. Rodger Chaffee will perform a series of phasing burns to rendezvous with ISS. Vehicle capture is planned for Friday, April 19, at 4:30 AM CT.  JEMAL (JEM Airlock) Configuration: …
Xfer I/F JEM Active Mechanism Tether Loop Removal Structures and Mechanisms (S&M)

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 05/04/15 – NASA

https://www.nasa.gov/blogs/stationreport/2015/05/04/iss-daily-summary-report-05-04-15/

Robotics Refueling Mission (RRM) Operations: Over the weekend, the Special Purpose Dexterous Manipulator (SPDM) picked up Task Board 2 (TB2) and the Safety Cap Tool (SCT) from the RRM. The Mobile Transport (MT) was translated to Work Site (WS) 7 where the SPDM stowed TB2 and the Safety Cap Tool on the RRM On-orbit Transfer Cage …
valve R&R MRM1 Interior Imagery and photos downlink via OCA / r/g 8682 “CHIBIS-M

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 1/14/2020 – NASA

https://www.nasa.gov/blogs/stationreport/2020/01/14/iss-daily-summary-report-1-14-2020/

Confined Combustion: The crew continued the experiment, using a series of fabric (Sibal) samples with either no baffles, shiny/reflective baffles, or clear baffles installed at various distances from the samples.  Sibal fabric is a mixture of fiberglass and cotton which keeps its basic shape as it burns.  Seven total samples/ignitions were completed today.  The baffles …
File Prep Preparation of reports for Roscosmos website and social media ECON-M.

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 1/03/2020 – NASA

https://www.nasa.gov/blogs/stationreport/2020/01/03/iss-daily-summary-report-1-03-2020/

Rodent Research-19 (RR-19): The crew completed the last set of Bone Densitometer scans using the Experiment box in the Life Science Glovebox. The crew also performed the Rodent Transporter Setup. Mighty Mice in Space: Preclinical Evaluation of a Broad Spectrum Myostatin Inhibitor to Prevent Muscle and Bone Loss Due to Disuse uses rodent models on …
Densitometer Maintenance Work Area Preparation Checking SW version of CoaguChek-M

    Kategorien:
  • International
Seite melden