ISS Daily Summary Report – 5/17/2023 – NASA https://www.nasa.gov/blogs/stationreport/2023/05/17/iss-daily-summary-report-5-17-2023/
Payloads: Dose Distribution Inside the International Space Station – 3D (DOSIS-3D): The DOSIS-3D main box was moved to its original location at the European Physiology Module (EPM) rack in the Columbus module. ISS crewmembers are continually exposed to varying levels of radiation, which can be harmful to their health. DOSIS-3D uses several active and passive …
, May 19 (GMT 139) Payloads: APM Status Check BCAT Hardware Locate CIR/SoFIE GEL