Dein Suchergebnis zum Thema: Mann

ISS Daily Summary Report – 11/19/14 – NASA

https://www.nasa.gov/blogs/stationreport/2014/11/19/iss-daily-summary-report-11-19-14/

Khladon (Freon 218) Venting:  Samokutyaev and Serova performed steps to release pressure in the Russian Segment Air Conditioner System [СКВ] by venting Khladon (Freon 218) overboard.  However, several of the quick disconnects that were actuated during the procedure exhibited leaks. As a result, the Khladon was vented into the cabin instead.  The quantity released was …
The FLEX-2 experiment studies the rate and manner in which fuel is burned, the conditions

    Kategorien:
  • International
Seite melden

Ax-3 Launch Date Adjusted; Crew Harvests Plants and Conducts Fluid Research – NASA

https://www.nasa.gov/blogs/spacestation/2024/01/17/ax-3-launch-date-adjusted-crew-harvests-plants-and-conducts-fluid-research/

As part of NASA’s efforts to open access to space, SpaceX and Axiom Space now are targeting no earlier than 4:49 p.m. EST Thursday, Jan. 18, for launch of the third private mission to the International Space Station. The date adjustment for Axiom Mission 3 (Ax-3) allows additional time for SpaceX to complete data analysis …
station, SpaceX observed some of the stitches didn’t pull through in the expected manner

    Kategorien:
  • International
Seite melden