Dein Suchergebnis zum Thema: Hand

Astronaut TJ Creamer Leaves ‘Astro-POD’ Mark at NASA’s Payload Operations Integration Center – NASA

https://www.nasa.gov/centers-and-facilities/marshall/astronaut-tj-creamer-leaves-astro-pod-mark-at-nasas-payload-operations-integration-center/

It only took one smell of flavored coffee percolating down the hallway of the Payload Operations Integration Center at NASA’s Marshall Space Flight Center in
Creamer left his workstation and went into the viewing room to share some first-hand

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 7/31/2020 – NASA

https://www.nasa.gov/blogs/stationreport/2020/07/31/iss-daily-summary-report-7-31-2020/

Payloads BioMole: The crew performed BioMole part 3 of the science session, which consists of preparation of the previously amplified DNA (DeoxyriboNucleic Acid), followed by sequencing using the MinION.  The BioMole Facility non-culture based samples are capable of providing microbial identification on-orbit within days of sampling.  The goal of this tech demonstration is to conduct …
Transfer, And EXPRESS Rack Install Crew Dragon Seat Actuator Checkout Crew Dragon Hand

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 07/01/15 – NASA

https://www.nasa.gov/blogs/stationreport/2015/07/01/iss-daily-summary-report-07-01-15/

ISSpresso: Kelly performed troubleshooting on the ISSpresso.  He was instructed to remove a deformed capsule lodged in the chamber and proceed with a nominal brewing.  The ISSpresso machine is a technical demonstration experiment that has the capability to provide hot beverages including espresso and still maintain the crema when dispensed in space. Capillary Effects of …
checkout the Camera Control Panel (CCP), Remote Interface Panel (RIP), RMS monitor and hand

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 09/23/13 – NASA

https://www.nasa.gov/blogs/stationreport/2013/09/23/iss-daily-summary-report-09-23-13/

Cygnus Status: On Sunday, the joint operations teams discontinued the nominal rendezvous attempt with ISS when Cygnus’s Relative GPS (RGPS) System was unable to initialize. The problem stems from Cygnus GPS time reference not matching that of the JEM’s GPS time.  The A3 DV burn which was scheduled to occur this morning at 7:29 a.m. CDT …
Program (RPOP) Setup: Flight Engineer (FE)-5 Parmitano setup and checked out the Hand-Held

    Kategorien:
  • International
Seite melden