Dein Suchergebnis zum Thema: Elfe

Meintest du elbe?

ISS Daily Summary Report – 8/30/2022 – NASA

https://www.nasa.gov/blogs/stationreport/2022/08/30/iss-daily-summary-report-8-30-2022/

Payloads: Advanced Nano Step: Following the completion of the experiment session, the Advanced Nano Step specimen cell was removed from its cartridge and Solution Crystallization Observation Facility (SCOF), and prepared for return to the ground on Crew-4. The Advanced Nano Step experiment monitors and records how the incorporation of specific impurity molecules affect the development …
Electro-static Levitation Furnace (ELF): The crew gained access to the experiment

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 2/25/2021 – NASA

https://www.nasa.gov/blogs/stationreport/2021/02/25/iss-daily-summary-report-2-25-2021/

Payloads CIR (Combustion Integrated Rack) Fluids and Combustion Facility: The crew set the CIR FOMA Calibration Valve to the close position as part of preparation steps for performing the first part of the FOMA Calibration. The CIR includes an optics bench, combustion chamber, fuel and oxidizer control, and five different cameras for performing combustion investigations …
Electro-static Levitation Furnace (ELF): The crew removed and replaced the Fixation

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 12/28/2020 – NASA

https://www.nasa.gov/blogs/stationreport/2020/12/28/iss-daily-summary-report-12-28-2020/

Payloads NanoRacks Module-9: The crew performed the 3rd operations of sample tube mixtures. NanoRacks Module-09 is a combination of 35 experiments provided by school students from 5 different countries. The experiments are housed within a NanoRacks Module container and is a combination of biological static experiments and some experiments that require crew interaction to mix …
Electro-static Levitation Furnace (ELF): The crew exchanged the Round Robin sample

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 8/13/2020 – NASA

https://www.nasa.gov/blogs/stationreport/2020/08/13/iss-daily-summary-report-8-13-2020/

Payloads Astrobee: The crew powered up the Astrobee free flyers and cleared away and stowed items within the JEM module in preparation for Astrobee flyer operations. Astrobee is made up of three free-flying, cube-shaped robots which are designed to help scientists and engineers develop and test technologies for use in microgravity to assist astronauts with …
Electro-static Levitation Furnace (ELF): The crew installed the Round Robin #2 Sample

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 12/12/2016 – NASA

https://www.nasa.gov/blogs/stationreport/2016/12/12/iss-daily-summary-report-12-12-2016/

Human Research Collections: The crew performed collections for several Human Research experiments today. Samples were collected and stowed in Minus Eighty Degree Celsius Laboratory Freezer for ISS (MELFI).  Samples were collected for Biochemical Profile, Repository, and Multiomics. The Biochemical Profile experiment tests blood and urine samples obtained from astronauts before, during, and after spaceflight. Specific …
Electrostatic Levitation Furnace (ELF): In preparation for ELF operations, the gas

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 11/30/2023 – NASA

https://www.nasa.gov/blogs/stationreport/2023/11/30/iss-daily-summary-report-11-30-2023/

Payloads: BioFabrication Facility (BFF): Cardiac Tissue Cassettes were inserted into the BFF and printing of cardiac cells was initiated. Using 3D biological printers to produce usable human organs has long been a dream of scientists and doctors around the globe; however, printing the tiny, complex structures found inside human organs, such as capillary structures, has …
Electro-static Levitation Furnace (ELF): ELF Cartridge A, holder 035 was removed

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 5/07/2021 – NASA

https://www.nasa.gov/blogs/stationreport/2021/05/07/iss-daily-summary-report-5-07-2021/

Payloads AC Touch: Per standard procedure, the crew touched both the coated and uncoated coupons for this long-term investigation. Boeing Environment Responding Antimicrobial Coatings tests is an antimicrobial coating on several different materials that represent high-touch surfaces. Some microbes change characteristics in microgravity, which could create new risks to crew health and spacecraft systems as …
ELF (Electrostatic Levitation Furnace): The crew performed the steps necessary to

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 10/28/2022 – NASA

https://www.nasa.gov/blogs/stationreport/2022/10/28/iss-daily-summary-report-10-28-2022/

82 Progress (82P) Docking: Following the completion of a 34-orbit rendezvous, 82P successfully docked to the ISS Poisk Mini-Research Module 2 (MRM-2) Zenith port yesterday at 9:49 PM CT. The crew then performed leak checks, opened hatches, and began unloading cargo. Carrying food, fuel, and supplies, 82P launched from the Baikonur Cosmodrome on Tuesday, October …
Payloads: Electrostatic Levitation Furnace (ELF): The crew gained access to the experiment

    Kategorien:
  • International
Seite melden

ISS Daily Summary Report – 8/02/2019 – NASA

https://www.nasa.gov/blogs/stationreport/2019/08/02/iss-daily-summary-report-8-02-2019/

BioFabrication Facility (BFF) Test Print:  Today the crew installed the test print cassette, performed a syringe swap, then removed the test print cassette following the BFF printing ops. This was done in support of the first test print using cells in the BFF. During the ground-commanded BFF operations, there was an accidental release of the …
Electrostatic Levitation Furnace (ELF) Controller Installation: The crew performed

    Kategorien:
  • International
Seite melden